1 research outputs found

    Aplicaci贸n de la metodolog铆a lean six sigma green belt para la disminuci贸n de los tiempos de preparaci贸n de la maquina extrusora 301 en una empresa cablera

    No full text
    This project麓s objective is the decrease in preparation times of the extruder machine in a cable network company through the application of the lean six sigma, a methodology developed with the purpose of improving the overall process, decreasing the variety of such and the elimination of the eight kinds of waste that could arise. For the completion of this project, the application of a variety of tools such as SMED and 5s has been principal to the task to decrease the preparation times of the extruder machine 301, cable lines of medium tension, and a statistical analysis executed via the program Minitab v16.Este proyecto tiene por objetivo la disminuci贸n de los tiempos de preparaci贸n de la m谩quina extrusora 301 en una compa帽铆a cablera mediante la aplicaci贸n de lean six sigma, una metodolog铆a desarrollada con la finalidad de mejorar los procesos disminuyendo la variabilidad de los mismos y la eliminaci贸n de los 8 desperdicios que pueden presentarse. Para el desarrollo de este proyecto se ha tomado como base la aplicaci贸n de distintas herramientas como SMED y 5s con el fin de disminuir los tiempos de preparaci贸n de la maquina extrusora 301 l铆nea de cables de media tensi贸n y un an谩lisis estad铆stico fundamentado en el software Minitab v16.Universidad de San Buenaventura - Cal
    corecore